Gale V
Recreation of the 1955 hydro
The 1955 GALE V replica is well underway.
The left sponson is ready to cover
My wife, Judy is my helper
The metal is going on the sponsons. Eight pieces down, eight to go.
all metal installed on the bottom except left angle and spoiler.
All metal is attached to the bottom. Roll over date is next Sat. Were
polishing the bottom now.
The Gale is upright and the inside sealed.
We have the deck nearly finished. Quite a project considering we really
had not done one before.
The deck is fiberglassed and we are fitting the cowlings.
© Bill & Judy Black
Back to the boats
Home |