Historical Message Board Archive — These discussions are preserved for historical reference. The original board is no longer active.
Discussion Index | Search Archived Discussions | Vintage Hydroplanes Home
  << Previous Topic | Next Topic >>return to General Discussion Board  

Winter Projects at The House of Overkill

October 20 2008 at 3:25 PM
phil mitchell 

1. The Bull of the Woods continues. We do have the drive-line installed and bolted in for good. This is the new 1.250"D shaft with new bushings in the strut and whip-strut. Along with the new shaft log and seal.

Steering would be next. We need to fabricate bracing under the dash cowl to take steering post load as the new cowls are too thin to take the load as before.

The rear cowl has been trimmed to fit and matched to the deck using the scribing dividers method. we've cut the wood forms that attach to the deck. They are nearly complete with just minor smoothing still needed. Attachment hardware will be next on this section.

2. The Flying Tiger (Pussycat) has had the damage from the Wheeling Regatta repaired. All that is needed on the boat is primer and paint.

The rudder and rudder mount being another story. Work to locate a no longer needed rudder is underway.

3. Edelweiss is going back together. A new mid-strut bushing is being fabricated with arrival soon at HoO. The engine is back after some minor fuel system tuning at Wheeler Racing Engines.

Trailer modifications are underway with walkways being installed and the rear of the tilt cradle modified to allow removal of the prop shaft while the boat is sitting on the trailer.


Woody - Head Woodpecker House of Overkill

 
    
 
     
  << Previous Topic | Next Topic >>return to General Discussion Board